We are focusing on exploring a new driving force for growth by concentrating
on diversification of business such as overseas resources development, engineering business etc.

Engineering Business

Power Plants

Based on professional technical skills, we have performed the planned preventive maintenance for power generating
facilities since we were certified as a company eligible for maintenance of 5 power plants

and are registered as a partner for power plants and have actively performed construction and
the follow-up management with the best quality.

We have made the best effort for customer satisfaction on the basis of

every sort of machine tools and process technologies, diverse design experiences and know-how of constructing plants Kyungdong has.

Major Projects

No. Equipment Specification Quantity Client Completed
18 Screw Feeder Shaft Repair Shaft(Ø400) etc. 3 Lot Korea East-West Power Co., Ltd. Donghae Bio Power Sep 2018
17 Reclaimer Shaft etc. Ø470x3,510L etc. 1 Lot Korea East-West Power Co., Ltd. Donghae Bio Power Oct 2019
16 Metropolitan Water Fog System High-pressure pipe(100bar) 1 Lot Korea Western Power Co., Ltd. Taean Power Plant Nov 2018
15 Fly Ash Silo Facilities Vacuum Cleaning Facilities 1 Lot Korea East-West Power Co., Ltd. Donghae Bio Power Nov 2018
14 Day Bin Reclaimer Disassemble Reclaimer, turntable 2 Lot Korea East-West Power Co., Ltd. Donghae Bio Power Nov 2017
13 B/C Belt Replacement (270m) NN800 900Wx5Px5x3 1 Lot Korea East-West Power Co., Ltd. Donghae Bio Power May 2019
12 Woodchip Sample Collection System 3Point/1cycle 1 Lot Korea East-West Power Co., Ltd. Donghae Bio Power May 2018
11 Planned Preventive Maintenance CV-2 Belt Replacement etc. 1 Lot Korea East-West Power Co., Ltd. Donghae Bio Power Mar 2019
10 Planned Preventive Maintenance Deck Installation construction 1 Lot Korea East-West Power Co., Ltd. Donghae Bio Power Mar 2018
9 Conveyor Safety Fence B/C(6km section) 1 Lot Korea Southern Power Co., Ltd. Samcheok Power Division Jun 2019
1 2